The SCDF Fire Code in Singapore: What FSC, TFP and FC Actually Require

The SCDF Fire Code in Singapore is the technical standard that every building’s fire safety installations are designed, built and approved against, and three separate approvals sit on top of it: the Fire Safety Certificate, the Temporary Fire Permit, and the Fire Certificate. Building owners usually encounter all three names at different points of a project and assume they mean roughly the same thing. They do not, and mixing them up is the single most common cause of delay we see as a fire protection company in Singapore when a building is ready to open but the paperwork is not.

The Fire Safety Act and the Fire Code 2023, in plain terms

The Fire Safety Act is the law. The Fire Code 2023 is the technical document issued under that law, setting out how fire safety systems must be designed, installed and maintained. Every fire hydrant, sprinkler, alarm panel and exit sign in a Singapore building is there because the Fire Code requires it, at a standard the Code specifies.

The Fire Code organises buildings into Purpose Groups, a classification based on how a building is used rather than how it is built. A warehouse, a school and a shopping centre sit in different Purpose Groups because the risk profile, the occupant load and the expected evacuation pattern all differ. The Purpose Group a building falls into decides which fire safety provisions apply, which is why two buildings of similar size can have very different fire safety requirements.

Who actually submits the plans

Fire safety plans are not submitted by the building owner directly. A Qualified Person, typically a registered architect or professional engineer with the right accreditation, prepares and submits the fire safety plans to SCDF on the owner’s behalf. The QP’s sign-off is what SCDF relies on to confirm the design meets the Fire Code before any approval is issued.

  • New construction and major additions or alterations need fresh fire safety plan submission
  • Minor Additional and Alteration works have their own, lighter submission track
  • A change of use that shifts a building into a different Purpose Group usually triggers a fresh review
  • Petroleum and flammable material storage carries its own separate licence and permit application

This is also where a QP and PE consultancy service earns its place in a project. Getting the Purpose Group classification right at the start, including how it affects provisions such as a building’s fire hydrant system, avoids a second round of plan submission later, which is a more expensive and slower way to arrive at the same compliant building.

The three approvals, in the order a building actually meets them

1. The Fire Safety Certificate

The Fire Safety Certificate, or FSC, is the one-off approval confirming that a building’s fire safety installations have been completed and inspected, and that the building is safe to occupy. It is issued once, at completion, not renewed on a schedule. No building should be occupied, and no Temporary Occupation Permit should be sought, before the FSC stage has been cleared.

The FSC application follows directly from the approved fire safety plans. SCDF or a Registered Inspector carries out the inspection, checking that what was built matches what was approved and that every system works as designed. Discrepancies between plan and site, however minor, are usually what holds an FSC application up.

2. The Temporary Fire Permit

The Temporary Fire Permit, or TFP, exists for the gap between “substantially complete” and “fully complete.” Where a building’s fire safety works are functional and safe but some elements remain outstanding, a TFP allows limited occupation while the remaining items are finished off. It is not a substitute for the FSC, and it is not meant to be extended indefinitely; it is a bridge, not a destination.

Owners sometimes treat a TFP as if it settles the matter. It does not. The outstanding items that justified the TFP in the first place still need to be closed out and the FSC still needs to follow, and a building that lingers on TFP status for too long tends to draw closer scrutiny rather than less.

3. The Fire Certificate

The Fire Certificate, or FC, is different in kind from the other two: it is an ongoing, periodic certification rather than a one-off completion milestone. Designated buildings, generally those with a higher occupant load or fire risk, need an FC renewed on a recurring basis to confirm their fire safety systems continue to perform as designed, long after the building first opened.

This is where building owners most often get caught out, because an FC renewal depends on the building’s fire protection systems being properly maintained in the interim, not just working on the day of inspection. A hydrant that has not been flow tested, a hose reel nobody has serviced in years, or a fire alarm panel with unresolved faults will all surface at FC renewal time, usually at the least convenient moment. Many buildings close this gap by engaging a Fire Safety Manager service to keep maintenance records current between renewals, rather than scrambling to assemble them when the renewal notice arrives.

Where this actually goes wrong on real buildings

hield logo reading "FIRE SAFETY" with firefighting icons.

Three patterns account for most of the delays we see. First, plans submitted against the wrong Purpose Group, discovered only at FSC inspection stage, forcing a resubmission. Second, a TFP treated as a long-term arrangement rather than a bridge, with the outstanding works never actually closed out. Third, an FC renewal that assumes “it worked last time” is enough, when the Fire Code requires evidence of ongoing maintenance, not just a working system on inspection day.

What this means for a facility manager day to day

  • Know which Purpose Group your building sits in, and flag any change of use to your QP before it happens, not after
  • Treat a Temporary Fire Permit as a deadline, not a status
  • Keep maintenance records current between FC renewals, since the renewal inspection checks the paper trail as much as the equipment
  • Route Fire Safety Certificate, Temporary Fire Permit and Fire Certificate applications through your Qualified Person, rather than attempting direct SCDF submission
  • Build FC renewal into your facilities calendar well ahead of the due date, since remedial works found during renewal still need time to complete

None of this is complicated once the three approvals are separated out in your head. The confusion almost always comes from treating FSC, TFP and FC as interchangeable paperwork, when each one answers a genuinely different question: is the building safe to occupy, is it safe to occupy right now while finishing, and is it still safe to occupy years later.

KIMTY’s QP and PE consultancy service handles fire safety plan drafting, Qualified Person and Professional Engineer endorsements, and submission to FSSD across all three approval stages, for buildings in every Purpose Group we work with. If your building is approaching an FC renewal or sits in TFP limbo with outstanding items unresolved, get in touch with our team to work through what is actually left to close out.

Frequently Asked Questions

What is the difference between a Fire Safety Certificate and a Fire Certificate?

The Fire Safety Certificate is a one-off approval issued when a building’s fire safety installations are complete and the building is first cleared for occupation. The Fire Certificate is a separate, recurring approval that designated buildings must renew periodically to confirm their fire safety systems are still being maintained, long after the building has opened.

No, only designated buildings, generally those with a higher occupant load or fire risk under the Fire Code’s Purpose Group classification, are required to hold and renew a Fire Certificate. Smaller or lower-risk premises may only need the one-off Fire Safety Certificate at completion.

A Temporary Fire Permit is meant to cover a short gap while outstanding fire safety works are completed, not to serve as a long-term arrangement. The specific duration is set case by case by SCDF based on what remains outstanding, so it should always be treated as a deadline to close out the remaining works rather than an open-ended status.

Fire safety plans must be submitted by a Qualified Person, typically a registered architect or professional engineer with the relevant accreditation, rather than by the building owner directly. The Qualified Person’s endorsement is what SCDF relies on to confirm the design meets the Fire Code before any approval is issued.

A change of use that moves a building into a different Purpose Group usually triggers a fresh fire safety plan review, because the provisions that apply depend on how the building is used, not just how it is built. Flagging a planned change of use to your Qualified Person before the change happens avoids a forced resubmission discovered later at inspection.

A Fire Certificate renewal checks that fire safety systems have been properly maintained in the period since the last certification, not only whether they happen to work on the day of inspection. Gaps in servicing records, overdue testing, or unresolved faults logged since the last renewal are common reasons an otherwise functioning system still fails to pass.